2007
Phase 1 begins with installation of 36-inch and 42-inch transmission waterlines and a small portion of 10-inch distribution waterlines that connect the existing water system east of the Rio Grande to the South Valley east of Coors Blvd and west of the Rio Grande. In total, approximately 22,310 linear feet of transmission waterline and 7,500 linear feet of distribution waterline are completed.