2023-2026
Phases 8A and 8B are being designed through the winter of 2023/2024, with construction for Phase 8A and part of 8B expected to begin in the summer of 2024 and be completed by winter 2025.
Phases 8A and 8B are being designed through the winter of 2023/2024, with construction for Phase 8A and part of 8B expected to begin in the summer of 2024 and be completed by winter 2025.