2014-2020

Construction of Phase 7 is split into multiple sub-phases due to funding restrictions. Phase 7 includes installation of waterlines east of Coors Blvd. and west of the Rio Grande River between Los Padillas Rd. and I-25. A neighborhood on the south side of I-25, between Isleta Blvd. and the Rio Grande River is also included.

Phase 7A includes installation of approximately 10,700 linear feet of distribution waterline and 80 water services in the arterial/collector roads providing the backbone infrastructure for phase 7.

Phase 7B and 7C include installation of approximately 29,000 feet of distribution waterline throughout the remaining area of Phase 7.